FPSO operator situation

smit-bracket

Summary specification reference

Testing and confirmation

Load test summaries

Test specimen: PODx
podx test spec
Results
PODx Release test under 200T load - according to operation specifications and OCIMF requirements.
 
podx-on-fpso
podx-hpu-location
podx-installed-fpso

SUPPORT

GTAC

GTAC-CERTIFIED
reduce-operational-risk-3

Marine Breakaway Couplings

OCIMF

CONTACT